Surface preparation

Let us do the legwork and prepare the leading edge for the LEP panel application. Several rope access teams are already using automated technology to reduce turbine downtime and speed up the installation process. 

Gallery of leading edge preparation

We can team up and do the legwork for rope access technicians installing the LEP panels. Our surface preparation is 3x faster. Reduce downtime!

AERONES SIA
+371 2809 0999

EU: Vestienas 32, Riga, Lavia, LV-1035
+4942139048966

US: 105 N 1st St #429 PMB 22980 San Jose, CA 95103
+1 6692138050

Copyright © 2020. Aerones, All rights reserved

 .